diff options
author | Ofer Heifetz <oferh@marvell.com> | 2018-08-29 11:56:04 +0300 |
---|---|---|
committer | Stefan Roese <sr@denx.de> | 2018-09-19 09:00:39 +0200 |
commit | cd11b2b457bb8aa5e0e72c4d90df1c7995c738b4 (patch) | |
tree | 4815b31814637d891826677536ef99ef2a1790b4 /tools/logos/intercontrol.bmp | |
parent | 658999244a0446a32301bc34c8fa53f1a3f05594 (diff) |
mtd: nand: pxa3xx-nand: fix random command timeouts
When 2 commands are submitted in a row, and the second is very quick,
the completion of the second command might never come. This happens
especially if the second command is quick, such as a status read
after an erase
This patch is taken from Linux:
'commit 21fc0ef9652f'
("mtd: nand: pxa3xx-nand: fix random command timeouts")
Signed-off-by: Chris Packham <judge.packham@gmail.com>
Signed-off-by: Ofer Heifetz <oferh@marvell.com>
Reviewed-by: Igal Liberman <igall@marvell.com>
Cc: Stefan Roese <sr@denx.de>
Cc: Simon Glass <sjg@chromium.org>
Signed-off-by: Stefan Roese <sr@denx.de>
Diffstat (limited to 'tools/logos/intercontrol.bmp')
0 files changed, 0 insertions, 0 deletions